Performance Management
  • Our factory has been performing a performance evaluation system every 6 months since 2019. Performance premium is charged according to performance score.
  • The score system is graded according to the lower-middle-upper levels.
  • The performance evaluation system has two parameters, observable (30%) and measurable (70%).